Ongoing
maintenance
As
part of our ongoing maintenance contract with Severn Trent Water we have recently
completed the following jobs;
Replacing
an old staircase with new case concrete spiral staircase. The existing decayed
structure was removed. The new staircase was constructed with temporary propping
fitted until the concrete had cured. The propping was cleared away and tarmac
at the base reinstated.
Replacing
tiled roof and renewing defective roof timbers. Access scaffolding was erected
and the existing roof stripped of tiles. All defective roof timbers were replaced
and new felt, battens and tiling fixed. Exposed timber was redecorated and
finally the scaffolding was removed.
We
have painters working full time on routine maintenance and larger projects.